Designing a plant expansion in a groundwater area so that the new plant meets the regulatory requirements from the point of view of handling chemicals and, in particular, managing chemical spills.
Enmac reviewed the implementation principles of leakage management so that the double detainment required by the groundwater area can be implemented cost-efficiently in connection with the plant expansion. In addition, Enmac prepared preliminary design materials on a chemical loading station.