Challenge:

It was time to replace a customer’s slurry process equipment. The process and the confined process spaces had sites for which better solutions were wanted in connection with the replacement of the equipment.

Solution:

The equipment was placed in the existing space so that working is easier and the blockage problems of the slurry process are reduced.

Result:

Thanks to the new equipment placement, the working space improved and the bottlenecks that caused the slurry process to become clogged widened.