The customer wanted to improve the safety of lye and hypochlorite loading sites. In the old loading site there was no safe access to the tanker truck which also slowed down the loading process. During the modernization project, at least one of the old loading sites had to be operating.
Our scope of supply included the safety structures, but also the design, manufacture and delivery of piping and foundations. We carried out the installation and extension work that included earthworks, foundations, steel structures and piping. In addition to the equipment installation and construction work we were responsible for the management and safety of the entire construction site.